Removal Of Pcbs (Pattern 2) - Daikin FTKS20KVLT Service Manual

Removal procedure
Table of Contents

Advertisement

Removal of PCBs (Pattern 2)

7. Removal of PCBs (Pattern 2)
Procedure
Step
1
Appearance of the
electrical box
2
Remove the screw.
Remove the terminal
3
board.
4
Cut the clamp.
20
Warning
Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Procedure
Control PCB
Signal receiver PCB
Display PCB
(inside)
Terminal
board
Shield plate
(R13107)
(R13108)
(R13110)
(R13109)
Si041049
Points
Removal Procedure

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents