Removal Of Pcbs (Pattern 1) - Daikin FTKS20KVLT Service Manual

Removal procedure
Table of Contents

Advertisement

Removal of PCBs (Pattern 1)

6. Removal of PCBs (Pattern 1)
Procedure
Step
1. Remove the shield plate.
1
The figure shows the
appearance of the
electrical box.
2
Unfasten the hooks at
the upper 2 positions of
the shield plate.
Unfasten the hook at
3
the side of the shield
plate.
4
Lift up the shield plate
to unfasten the lower
hooks and remove it.
14
Warning
Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Procedure
Control PCB
Signal receiver PCB
Display PCB
(inside)
Hook
Preparation
Remove the electrical box
according to the "Removal of
Shield plate
Electrical Box".
INTELLIGENT EYE
sensor PCB
(R13747)
Hook
(R8085)
Shield plate
Hook (side)
Hook (lower)
(R10619)
Si041049
Points
Removal Procedure

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents