Download Print this page

Removal Of Pcbs - Daikin 4MXS100EV2C Service Manual

Removal procedure, 8.0/8.5/10.0 kw class 32000 btu/h class, outdoor unit, inverter, multi type, heat pump

Advertisement

Removal of PCBs

3. Removal of PCBs
Procedure
Step
1. Remove the main PCB.
1
Remove the cover of
the electrical box.
2
Remove the 3 screws.
3
Unfasten the 4 hooks.
Lift up the main PCB.
4
22
Warning
Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Procedure
Hook
Hook
Release the 4 hooks. The
hooks are marked with
(R14617)
Main PCB
(R10404)
(R10405)
(R10406)
Si12-995
Points
.
(R6427)
Removal Procedure

Hide quick links:

Advertisement

loading

This manual is also suitable for:

4mxs32gvju4mxs80hvldPmxs4gv2c