Installing an EPS-600LS Power Supply

To install an EPS-600LS unit into an EPS-C:
1 If necessary, remove a cover plate from a slot in the EPS-C.
2 Slide the EPS-600LS into an empty slot in the EPS-C (see
CAUTION
Be sure that empty slots in the EPS-C chassis are always covered by a cover plate when not in use. The EPS-C is
shipped with slots 2 and 3 covered and slot 1 open. Extreme Networks recommends that you populate slot 1
with an EPS-600LS unit first, but this is not required. You can install EPS-600LS units into any of the slots in
the EPS-C. The installation sequence does not affect the performance of the power supply units, but empty slots
must be covered at all times.
Figure 79: Installing the EPS-600LS Unit in the EPS-C Chassis
! See Manual
O.T.P
DC OK
AC OK
3 Slide the unit completely into the chassis until the front of the EPS-600LS is flush with the surface of
the EPS-C (see
Figure
4 Tighten the two captive screws on the EPS-600LS unit into the EPS-C (see
unit in place.
Summit Family Switches Hardware Installation Guide
80).
Installing an EPS-600LS External Power Module
Figure
79).
Figure
80). This secures the