Powering On The Switchsummit 300-48 Switch; Checking The Installationsummit 300-48 Switch - Extreme Networks Summit 200-24 Hardware Installation Manual

Consolidated “e” series
Hide thumbs Also See for Summit 200-24:
Table of Contents

Advertisement

"e" Switch Installation
Figure 19 shows the pin-outs for a 9-pin to RS-232 25-pin null-modem cable.
Figure 19: Null-modem cable pin-outs
Summit
Cable connector: 9-pin female
Screen
Shell
TxD
3
RxD
2
Ground
5
RTS
7
CTS
8
DSR
6
DCD
1
DTR
4
Figure 20 shows the pin-outs for a 9-pin to 9-pin PC-AT null-modem serial cable.
Figure 20: PC-AT serial null-modem cable pin-outs
Summit
Cable connector: 9-pin female
Screen
Shell
DTR
4
TxD
3
RxD
2
CTS
8
Ground
5
DSR
6
RTS
7
DCD
1

Powering On the SwitchSummit 300-48 switch

Connect the AC power cable to the switch and then to the wall outlet. The Summit 300-48 has the
additional requirement to turn the power switch on the back panel to the on position..

Checking the InstallationSummit 300-48 switch

After connecting power to the switch, the device performs a Power On Self-Test (POST).
During the POST, all ports are temporarily disabled, the port LED is off, and the MGMT LED flashes.
The MGMT LED flashes until the switch successfully passes the POST.
If the switch passes the POST, the MGMT LED blinks at a slow rate (one blink per second). If the switch
fails the POST, the MGMT LED shows a solid amber light.
70
PC/Terminal
Cable connector: 25-pin male/female
1
Screen
3
RxD
2
TxD
7
Ground
4
RTS
20
DTR
5
CTS
6
DSR
8
DCD
ser_sum1
PC-AT Serial Port
Cable connector: 9-pin female
Shell
Screen
1
DCD
2
RxD
3
TxD
4
DTR
5
Ground
6
DSR
7
RTS
8
CTS
ser_sum2
Consolidated "e" Series Hardware Installation Guide

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Summit 200-48Summit 300-24Summit 300-48Summit 400-48t

Table of Contents