Management network A, nodes 1 - 16 cabling

Use the following figure and table to connect cables for management network A, nodes 1 - 16.
Figure 21 Management A, nodes 1 - 16 cabling example
Mgmt Switch A
2
4
Mgmt Server
Node 16
Node 1
BMC/
iDRAC
Table 9 Management A, nodes 1 -16 cabling
Source
Node 1 BMC (iDRAC)
Node 1 MGMT1
Node 2 BMC (iDRAC)
Node 2 MGMT1
Node 3 BMC (iDRAC)
Node 3 MGMT1
Node 4 BMC (iDRAC)
Node 4 MGMT1
Data Switch B
Data Switch A
MGMT
45
38
46
NIC1
MGMT1
<...>
47
To core switch or
48
Mgmt Switch B
Destination
Management SwitchA Port 2
Management SwitchA Port 4
Management SwitchA Port 6
Management SwitchA Port 8
Management SwitchA Port 10
Management SwitchA Port 12
Management SwitchA Port 14
Management SwitchA Port 16
Dell EMC VxFlex Ready Node Server Installation Guide
Install Management Network I/O Cables