iDM iPUMP A 2-7 Installation Instructions Manual page 29

Air heat pump with inverter-technology
Table of Contents

Advertisement

Loos the fi xing screws
Loos the fi xing screws
(C) IDM ENERGIESYSTEME GMBH
The rear panel is fi xed to the base frame by fi xing
screws. This screws must be loosened. After this, the
rear panel can be removed from the base frame.
At the front of the iPump, the electrical pan and the
main board are located above the refrigerating equip-
ment. The electrical pan can be hinge down when
loosing the fi xing screws.
The electrical pan is secured by a safety rope
against unintentional hinge down.
Anyway, ensure that the electrical pan does not
fall down when loosing the fi xing screws.
To loosen the safety rope, the locking nut must be
removed.
If the cover parts are removed, all hydraulic connec-
tion lines between the refrigeration equipment and
Safety rope
the hot water tank must be loosened.
Installation instructions iPump A 2-7, 3-11
disassemble the ipump
To assemble the indoor unit of the iPump in
the heating room, it is necessary that the
room has a minimum height of 2200 mm.
To the minimum height the dimensions of
the hydraulic piping and the tool must be
added.
The rear panel is only fi xed to the base
frame by fi xing screws. Please observe that
the rear panel do not fall down when the
fi xing screws.
Locking nut
29

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for iDM iPUMP A 2-7

This manual is also suitable for:

Ipump a 3-11

Table of Contents