Section 4 - Mounting And Wiring; Location; Dimensional Data; Mounting Procedure - Parker Porter MPC Series Installation, Programming, & User Manual

Panel mount mass flow controller
Table of Contents

Advertisement

SECTION 4 – MOUNTING AND WIRING

LOCATION

Avoid mounting the MPC Series Panel Mount MFC in locations subject to:
High and low temperature and humidity.
Sudden changes in temperature and condensation.
Corrosive and/or flammable gas-containing environments.
Environments containing high amounts of dirt, dust, salt, conductive substances (e.g. metal particles,
water, oil mist, etc.) and organic solvents.
Mechanical shock or vibration.
Direct sunlight or precipitation.
Splashing of oil or chemicals.
Sources of electrical interference and magnetic fields.

DIMENSIONAL DATA

MOUNTING PROCEDURE

PROCESS CONNECTION INSTALLATION
While installing the inlet and outlet process connections to the inlet and outlet 1/8" FNPT connectors,
do not hold the housing of the MPC Series Panel Mount MFC. Doing so may damage the MFC.
Inspect the process connections for any dirt or particulate matter. Apply an appropriate amount of
thread sealant to the 1/8" MNPT threads of both process connections.
Using a 14 mm wrench to secure the inlet and outlet 1/8" FNPT connectors and an appropriate size
wrench for the process connections, install each process connection according to the applicable
process connection manufacturer's specific recommendations regarding installation and tightening.
Overtightening the process connections will damage the 1/8" FNPT connectors.
- 9 -

Advertisement

Table of Contents
loading

Table of Contents