Installation & Cable Management - Havis DS-GTC-1000 Series Owner's Manual

Table of Contents

Advertisement

Installation & Cable Management
1) Remove the Mounting Bracket from the packaging. Install the Mounting Bracket to the Motion Device
using (4) 1/4"-20 x 5/8" long screws (Hardware Kit Item 3). Torque screws to 80 in-lbs (9.0Nm) ± 10%.
NOTE: Numerous hole patterns present in Mounting Bracket will accommodate Havis Motion Devices
as well as most competitors'.
NOTE: We recommend applying a drop of medium strength (blue)
2) Orient the Docking Station in a position that is comfortable to work with.
3) Install all cables that are necessary for computing needs. Use Zip Ties (Hardware Kit Item 1) to strain
relieve cables to the Strain Relief Points, routing all cables together through the Cable Channel and out
the rear of the Docking Station.
Cable Channel
thread locking adhesive to the threads of all fasteners.
1/4" – 20 x 5/8" Screws
Mounting Bracket
Typical Motion Device Example
(not included)
Cable Channel

Advertisement

Table of Contents
loading

Table of Contents