Service Manual - First Edition
43 Remove the pin retaining fastener from the
turntable pivot to number 3 arm pivot pin. Use
a slide hammer to remove the pin.
Crushing hazard. If the overhead
crane is not properly attached, the
number 3 arm may become
unbalanced and fall when it is
disconnected from the turntable
pivot.
44 Carefully remove the number 3 arm from the
machine.
45 Position the strap from an overhead crane
around the top tube of the lower mid-pivot and
then carefully lift the lower mid-pivot until it is
vertical.
46 Remove the pin retaining fastener from the
lower mid-pivot to number 4 arm pivot pin. Use
a soft metal drift to remove the pin.
47 Support the compression link by hand, then
carefully lift the lower mid-pivot up and over the
compression link and off of the machine.
Part No. 29487
SECONDARY BOOM COMPONENTS
48 Lower the compression link to a resting
position. Then attach the lifting strap from an
overhead crane to the compression link and
raise it to a vertical position.
49 Remove the pin retaining fastener from the
compression link to number 4 arm pivot pin.
Use a soft metal drift to remove the pin
50 Remove the compression link.
51 Position the lifting strap from an overhead
crane at the center of the number 4 arm.
52 Remove the pin retaining fastener from the
turntable pivot to number 4 arm pivot pin. Use
a slide hammer to remove the pin.
53 Carefully remove the number 4 arm.
Genie Z-45/22
Section 7 - Repair Procedures
Crushing hazard. If the overhead
crane is not properly attached, the
number 4 arm may become
unbalanced and fall when it is
disconnected from the turntable
pivot.
7 - 25