Safety Cable Installation - Monte Carlo Fan Company 3OVR60 D Series Owner's Manual And Installation Manual

Table of Contents

Advertisement

1
Before you begin installing the fan, Switch
power off at Service panel and lock
service disconnecting means to prevent
power from being switched on
accidentally. When the service
disconnecting means cannot be locked,
securely fasten a warning device, such
as a tag, to the service panel.
Use AC 120V/60HZ power supply
only.

SAFETY CABLE INSTALLATION

4
Safety cable
Lag screw
Safety cable
Washer
Lock washer
For Canadian installation and for USA fan
and light kit combinations over 35 lbs, in
both flush and downrod modes the safety
cable must be installed into the house
structure beams using 3" lag screws,
washers and lock washers provided.
Note
: If Installing The Secondary Support
Safety Cable in the U.S., Do Not Remove
Knockouts In The Outlet Box.
© 2018 Monte Carlo Fan Company
2
Ceiling
Ceiling
Joists
Before installing this fan makes sure the
outlet box is properly installed to the
house structure. Ensure the outlet box is
securely fastened by at least two points
to a structural ceiling member (a loose
box will cause the fan to wobble).
To reduce the risk of fire, electric shock,
or personal injury, mount to outlet box or
supporting system acceptable for fan
support.
(Mounting must support at least 35 lbs.)
5
Blade
Junction
Box
Mounting
Bracket
Set screw
Blade top plate
Blade
Place motor assembly on bottom
Styrofoam for blades installation.
Aligning the holes on blade, blade top
plate and the screw holes on flywheel as
shown in illustration, and then install the
set screws. Screws provided. Repeat this
process for remaining blades.
Tighten all set screws securely.
Note: Make sure the side with a label
"This side up" is installed upward.
3
2˝ x 4˝
Outlet
Box
Use metal outlet box suitable for fan
support and use only the screws provided
with the outlet box (must support 35
lbs). Remove the two outlet box screws
provided with the box, aligning the holes
of the mounting bracket with the holes of
the outlet box. Reinstall the 2 outlet box
screws securely.
Blade top plate
6
Keeper
pin
Partially loosen downrod set screws from
yoke at top of motor assembly.
Remove preassembled cross pin and
keeper pin from downrod. Keep parts.
3
Ceiling joist
Outlet Box
Mounting
Bracket
Screw/ Washers
/Spring Washers
Downrod
Cross
pin
Yoke
09/2018

Advertisement

Table of Contents
loading

This manual is also suitable for:

3ovr603ovr60rzwd

Table of Contents