Pit Boss 820FB Owner's Manual page 9

Table of Contents

Advertisement

Section One:
Parts Needed:
Hardware Required:
Screw 1/4"- 20* 3/5" x 2 (AA)
Installation Steps

Insert one screw (A) from inside the lid, through the hole
provided in the lid.

Place one Bezel (6) over the screw, then line-up the
handle (5) with the threaded end of the screw.

Hand start the screw into the handle,

Repeat procedure for other end of handle.

Using your wrench securely tighten ALL screws (A)
Part Needed:
16 Dome Thermometer
Installation Steps

The thermometer comes complete with its own threaded nut
already installed on the thermometer.

Simply spin off the threaded nut, and insert the thermometer
through the hole provided in the top of the hood,
Then firmly hand tighten the nut back onto the thermometer.
Note: Take care not to turn the face of the thermometer. This
will result in incorrect readings.
Parts Needed:
14 Smoke Stack
15 Smoke Stack Gasket
Hardware Required:
2
Screw 1/4"- 20* 3/5" x 2 (AA)
Installation Steps

Using the 2 screws (AA) insert them through the stack section, through the gasket, then finally through the
barrel end.

Hand start, then secure in place using your Phillips Screwdriver.

NOTE:
DO NOT lower the chimney cap tight to chimney stack. You must allow air to escape.
ASSEMBLY INSTRUCTIONS
ASSEMBLING THE LID HANDLE
5
Lid Handle
6
Decorative
Washers x 2
( Bezels )
Insulation Cardboard
ASSEMBLING THE DOME THERMOMETER
ATTACHING THE SMOKE STACK
Page 9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

820 deluxePb820fbPb820d

Table of Contents