Installation
4
Installation
Switch-off the system
Isolate the system from all power sources, ensure that
it cannot be switched back on, and verify that it is
safely isolated from the power supply.
Preparations
1. Remove the precut recess on the back wall and cut
out the insulation.
2. Remove the cover behind the recess by removing
four M8 hex nuts.
3. Glue the fibre glass seal to the flue gas duct flange
on the boiler side.
9
Need help?
Do you have a question about the HACK 200 and is the answer not in the manual?