Vivax HPS-41CH120AERI/O3 R410a User Manual page 137

Table of Contents

Advertisement

Available languages

Available languages

VIVAX
Remove refrigerant;
Purge the circuit with inert gas; Evacuate;
Purge again with inert gas; 
Open the circuit by cutting or brazing.
The refrigerant charge shall be recovered into the correct recovery cylinders. The 
system shall be flushed with OFN to render the unit safe. This process may need to 
be repeated several times. 
Compressed air or oxygen shall not be used for this task. 
Flushing  shall  be  achieved  by  breaking  the  vacuum  in  the  system  with  OFN  and 
continuing to fill until the working pressure is achieved, then venting to atmosphere, 
and  finally  pulling  down  to  a  vacuum.  This  process  shall  be  repeated  until  no 
refrigerant is within the system. 
When the final OFN charge is used, the system shall be vented down to atmospheric 
pressure to enable work to take place. This operation is absolutely vital if brazing 
operations on the pipe‐work are to take place. 
Ensure that the outlet for the vacuum pump is not closed to any ignition sources and 
there is ventilation available. 
16) Charging procedures 
In addition to conventional charging procedures, the following requirements shall
be followed:
Ensure that contamination of different refrigerants does not occur when using
charging equipment. Hoses or lines shall be as short as possible to minimize
the amount of refrigerant contained in them 
Ensure that apparatus is mounted securely. 
Ensure  that  seals  or  sealing  materials  have  not degraded  such  that  they  no 
longer serve the purpose of preventing the ingress of flammable atmospheres. 
Replacement  parts  shall  be  in  accordance  with  the  manufacturer  s 
specifications
Cylinders shall be kept upright. 
Ensure that the refrigeration system is earthed prior to charging the system
with refrigerant. Label the system when charging is complete(if not already).
Extreme care shall be taken not to overfill the refrigeration system.
Prior to recharging the system it shall be pressure tested with OFN. The
system shall be leak tested on completion of charging but prior to
commissioning. A follow up leak test shall be carried out prior to leaving the
site.
17)
Decommissioning
Before carrying out this procedure, it is essential that the technician is completely
familiar with the equipment and all its detail. It is recommended good practice that
all refrigerants are recovered safely. Prior to the task being carried out, an oil and
refrigerant sample shall be taken.
46 
ENG 

Advertisement

Chapters

Table of Contents
loading

Table of Contents