Installation Requirements; Drain Hole Position - Vivax HPS-41CH120AERI/O3 R410a User Manual

Table of Contents

Advertisement

Available languages

Available languages

ENG
Installation requirements 
Check the strength and level of the installation ground so that the unit may not cause 
any vibrations or noise during the operation. 
In accordance with the foundation drawing in the figure, fix the unit securely by means 
of foundation bolts. (Prepare four sets each of Φ10 Expansion bolts, nuts and washers 
which are readily available in the market.) 
Screw in the foundation bolts until their length is 20 mm from the foundation surface. 
 
Φ10 Expansion 
 
bolt
 
Rubber shocking 
 
 
proof mat
 
Solid ground 
 
or roofing
 
Drain hole position 
This drain hole is covered by rubber
plug. If the small drain hole can not
meet the drainage requirements, the
big  drain  hole  can be  used  at  the 
same time. 
4/6 wW
It's necessary to install an electrical heating belt if water can't drain out in cold weather
even the big drain hole has opened. 
 
It is suggested to site the unit with the base electric heater. 
Concrete basement 
 
h≥100mm
 
Fig 6‐3
 
Drain hole
 
 
 
Fig. 6‐5
 CAUTION 
15 
-
VIVAX
 
Fig 6‐4
 
Drain hole
 
8/10 kW
 

Advertisement

Chapters

Table of Contents
loading

Table of Contents