Mounting the fixing system
2.
Fig. 5
90°
Fig. 6
10
(cont.)
2
3.
4
1
4.
!
Please note
Rainwater can cause building damage.
To ensure contact with the entire surface area of
the flashing, make the cut-out in the roof cover
as small as possible. Affix flashing
5.
5
carefully.
2