Enterasys SecureStack C2 C2G124-48P Hardware Installation Manual page 68

Enterasys securestack c2 c2g124-48p: install guide
Table of Contents

Advertisement

Using LANVIEW
Table 4-1 LANVIEW LED Diagnostic Indications (continued)
LED
Color
Link/
Off
Activity
(RJ45
PoE ports
1–48)
Green
Amber
Link/
Off
Activity
(MGBIC
ports 45–
48)
Green
4-6 Troubleshooting
State
1.
No link.
2.
No activity or port in standby.
3.
The port is deactivated because the
Mini-GBIC port with the same port number
is linked.
Solid. Port is linked, but the interface is not
receiving any traffic. PoE power is okay.
Blinking. Port is linked and traffic is being
received or transmitted by the interface. PoE
power is okay.
Solid. Port is linked, but traffic is not being
received or transmitted by the interface. PoE
power has failed.
PoE power may have been deactivated because
of excessive power requirement or deactivated
by configuration.
Power Supply failed.
Blinking. Port is linked and traffic is being
received or transmitted by the interface. PoE
power has failed.
PoE power may have been deactivated because
of excessive power requirement or deactivated
by configuration.
Power supply failed.
1.
No link.
2.
No activity or port in standby.
3.
The port is deactivated because the RJ45
port with the same port number is linked.
Solid. Port is linked, but the interface is not
receiving any traffic.
Blinking. Port is linked and traffic is being
received or transmitted by the interface.
Recommended Action
None.
None.
None.
None.
None.
1.
Check the attached powered device
to see if it is defective.
2.
Internal power supply failed, contact
Enterasys Networks for technical
support.
1.
Check the attached powered device
to see if it is defective.
Internal power supply failed, contact
2.
Enterasys Networks for technical
support.
None.
None.
None.
None.
None.

Advertisement

Table of Contents
loading

Table of Contents