Checking the ionisation current
11.
repeatedly until "0" is shown under "Service".
Checking the fan pressure and AIC pressure
Fig. 10
Fig. 11
(cont.)
12. S to change to the operating display.
1. For the fan pressure, connect the pressure gauge
2. For the AIC pressure, connect the pressure gauge
A
Burner type
MDI 800
MDI 1000
If the fan pressure exceeds the values in the table with
a clean filter, clean the burner gauze assembly. See
page 24.
If the AIC pressure exceeds the specified value, clean
the air filter.
B
B
Commissioning, inspection, maintenance
to measuring point
with a tee.
A
Measure the fan pressure during full load operation
at the upper heating output.
to measuring point
, either directly or with a tee.
B
Measure the AIC pressure (negative pressure).
Fan pressure
mbar
mbar
AIC pressure
max.
max.
11
8
19
10
19