Checking the installation room ventilation air apertures
With open flue operation: Check that the ventilation
opening in the installation room is open and sufficiently
large.
Instructing the system user
The system installer should hand the operating instruc-
tions to the system user and instruct the user in oper-
ating the system.
Operating and service documents
1. Complete and detach the customer registration
card:
■
Hand system users their section for safekeeping.
Retain the heating contractor's section.
■
Commissioning, inspection, maintenance
This includes all components installed as accessories,
e.g. remote control units. In addition, the system instal-
ler must make the user aware of the required mainte-
nance work.
2. File all parts lists, operating and service instruc-
tions in the folder and hand this over to the system
user.
29