Initial start−up, inspection and maintenance
Further details regarding the individual steps
Checking the static and the supply pressure
A
8
(cont.)
Static pressure
1. Close the gas shut−off valve.
2. Release the screw in the test
nipple A, but do not remove.
3. Release the pressure gauge in the
test nipple A, but do not remove.
4. Open the gas shut−off valve.
5. Check the static pressure
(max. 60 mbar).
6. Record the test value in the
service report (on page 49).