Implementation
I
nspection
I
nspection
I
nspection
(cont.)
M
8. Cleaning the burner
aint.
1. Set the burner to maintenance.
2. Clean the housing C, the flame
tube A, the mixer B together
with the ignition and ionisation
electrode and the impeller D.
3. Check the gas outlet holes in the
sensor plate for contamination
and clean, if required (see item
on page 12).
M
9. Checking the flame tube fixings
aint.
See illustration under item 8.
M
10. Checking the impeller fixings
aint.
See illustration under item 8.
Initial start−up, inspection and maintenance
11
Cleaning the combustion
chamber and hot gas flues,
see boiler service
instructions.
11