Installation requirements
Check the strength and level of the installation ground so that the unit may not cause
any vibrations or noise during the operation.
In accordance with the foundation drawing in the figure, fix the unit securely by means
of foundation bolts. (Prepare four sets each of Φ10 Expansion bolts, nuts and washers
which are readily available in the market.)
Screw in the foundation bolts until their length is 20 mm from the foundation surface.
Φ10 Expansion
bolt
Rubber shocking
proof mat
Solid ground
or roofing
Drain hole position
This drain hole is covered by rubber
plug. If the small drain hole can not
meet the drainage requirements, the
big drain hole can be used at the
same time.
4/6 wW
It's necessary to install an electrical heating belt if water can't drain out in cold weather
even the big drain hole has opened.
It is suggested to site the unit with the base electric heater.
Concrete basement
h≥100mm
Fig 6‐3
Drain hole
8/10/12/14/16 kW
Fig. 6‐5
CAUTION
15
-
VIVAX
Fig 6‐4
Drain hole