Tilt Lift Preparation (Lowering) - IDEAL 7000TLX Assembly & Operation Manual

Automotive tilt lift 7,000 lb. capacity
Table of Contents

Advertisement

4. Ensure Platform, Pivot Pin, Washers & Spacers are properly installed to Tilt Lift Frame, as shown
below. Once confirmed, apply Nylon Nuts to each end of Pivot Pin to secure Platform assembly to
Lift Frame, using 30mm wrench & socket. Duplicate assembly steps 1-4 for opposite Platform.

Tilt Lift Preparation (Lowering)

1. Insert Drive Adapter into Power Drill and insert into either Gear Box. Note Direction to lower DOWN.
(Note: Drill's 'Forward or Reverse' to Lower Lift from either side. Manual Handle can also be used to Lower.)
After tightening
Nylon Nuts to Pin.
Test that Platform
pivots & slides
side-to-side freely.
8
TLX-7000
Aug 2021
Manual Handle
& Adapter

Advertisement

Table of Contents
loading

Table of Contents