Operating program
Frost protection
Symbol
Operating program
"Standby mode"
Operating programs for ventilation
Operating program
"Standby mode"
"Standard operation"
"Ventilation program"
Special operating programs
Display in the standard menu
21°C
14°C
Screed drying
Flow temperature
Fig. 9
Special operating programs
■
"Screed drying"
This function is activated by your contractor. Your
screed is dried in line with a set time program suita-
ble for the relevant building materials (temperature/
time profile). Your settings for central heating/central
cooling have no effect for the duration of screed dry-
ing.
■
"External hook-up"
Your heat pump control unit is regulated by a higher
ranking control unit.
Time program
The following explains how to enter the settings for a
time program. The special features of individual time
programs are described in the relevant chapters.
(cont.)
Function
No central heating/central cooling
■
No DHW heating
■
Frost protection for the heat pump, DHW cylinder, heating/cooling cir-
■
cuits and heating water buffer cylinder (if installed) is active.
Operating status
—
—
"Reduced"
"Standard"
"Intensive"
HC1
40°C
E
:
E
Air flow rate
No ventilation
Minimum air flow rate
Reduced air flow rate
Standard air flow rate
Maximum air flow rate
"External program"
■
The operating program was changed via a communi-
cation interface, e.g. Vitocom 100.
■
"Holiday program"
See page 31.
Note
In the extended menu, you can call up the set operat-
ing program under "Information": see page 51.
Operation
Ventilation
stage
0
1
2
3
4
21