Calling up information
■
Central heating for all heating/cooling circuits takes
place according to a set time program. Your settings
for central heating/central cooling have no effect for
the duration of screed drying.
■
DHW heating is active.
■
In conjunction with a ventilation unit:
The maximum air flow rate is set for mechanical ven-
tilation (
).
4
Display in the standard menu
21°C
14°C
Screed drying
Flow temperature
Fig. 37
Calling up screed drying for all heating/cooling cir-
cuits
1. Extended menu:
2. "Information"
3. "Heating circuit 1", "Heating circuit 2", "Heat-
ing circuit 3" or "Cooling circuit SKK"
4. "Operating program"
Heating circuit 1
Operating program:
Screed drying
Operating status:
Fixd value
Back with
Fig. 38
(cont.)
HC1
40°C
E
HC1
Remaining screed drying time
Screed drying lasts up to 32 days. The value displayed
for "Screed drying days" is the number of days
remaining.
1. Extended menu:
2. "Information"
3. "System"
System
Central fault
Time
Date
Screed drying days
Select with
Fig. 39
Calling up information
OFF
14:30 o'clock
We 19.01.2012
18
(
53