Siemens NXAIR Operating Instructions Manual page 71

Air-insulated switchgear ≤ 17.5 kv / ≤ 40 ka / ≤ 4000 a busbar current
Hide thumbs Also See for NXAIR:
Table of Contents

Advertisement

Operating the circuit-breaker panel
Take the low-voltage connector out of the support located underneath the low-voltage
compartment.
3
Fig. 110: Low-voltage connector stowed
Fig. 111: Instruction label for the
away
low-voltage connector
Carefully plug on the low-voltage connector (2) from the front.
To secure the low-voltage connector, push the longitudinal fastener (1) of the coupling
downwards.
Fig. 112: Plugging on and securing the low-voltage connector
Close the high-voltage door.
Switch the auxiliary voltage on.
The motor in the circuit-breaker starts up and charges the spring energy store. The spring
state indicator for the closing spring changes to CHARGED.
The low-voltage connector is plugged on and secured by the longitudinal fastener.
NXAIR / ≤ 40 kA
110-0134.9 / 14
71

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents