Siemens NXAIR Operating Instructions Manual page 7

Air-insulated switchgear ≤ 17.5 kv / ≤ 40 ka / ≤ 4000 a busbar current
Hide thumbs Also See for NXAIR:
Table of Contents

Advertisement

22.2
22.3
22.4
23 Accessing the connection compartment through the front ............................................................. 298
23.1
Preparations before accessing the connection compartment ...................................................................... 298
23.2
23.3
Installing the vertical partition in the switching-device compartment ............................................................ 307
23.4
with ventilation system type I ....................................................................................................................... 313
23.5
23.6
with ventilation system type II ...................................................................................................................... 324
23.7
23.8
with voltage transformer compartment ......................................................................................................... 333
23.9
switching-device compartment..................................................................................................................... 339
24 Accessing the connection compartment through the rear ............................................................... 347
24.1
Accessing the connection compartment through the rear side of the panel ................................................. 347
24.2
Installing the rear wall on the connection compartment ............................................................................... 353
24.3
Accessing the connection duct through the rear side of the panel ............................................................... 359
24.4
Installing the rear walls on the connection duct ........................................................................................... 362
25 Key-operated interlocks ....................................................................................................................... 365
25.1
Key-operated interlocks for the withdrawable part / switching-device truck ................................................. 365
25.2
Key-operated interlocks for the busbar earthing switch ............................................................................... 368
26 Fitting the earthing device ................................................................................................................... 370
26.1
Design, application and inspection of the earthing device accessories ....................................................... 370
26.2
Connecting the earthing device ................................................................................................................... 371
26.3
Removing the earthing device ..................................................................................................................... 378
27 Panels with motor operating mechanism control .............................................................................. 382
27.1
Overview of functionality .............................................................................................................................. 382
27.2
Opening the control door ............................................................................................................................. 386
27.3
Closing the control door ............................................................................................................................... 387
27.4
Selecting manual operation for racking ........................................................................................................ 388
27.5
Selecting electrical operation for racking ..................................................................................................... 390
27.6
Selecting interlocking ................................................................................................................................... 391
27.7
27.8
27.9
27.11 Opening the circuit-breaker manually .......................................................................................................... 403
27.12 Closing the circuit-breaker manually ............................................................................................................ 404
27.13 Charging / discharging the spring energy store manually ............................................................................ 405
27.14 Earthing / de-earthing the feeder manually .................................................................................................. 407
27.15 Earthing / de- earthing the feeder electrically............................................................................................... 409
27.16 Earthing / de-earthing the busbar system manually ..................................................................................... 410
27.17 Earthing / de- the busbar system electrically ............................................................................................... 410
27.18 Further operating options ............................................................................................................................. 411
27.19 Technical data / operating times .................................................................................................................. 412
27.20 Fault indication and fault evaluation ............................................................................................................. 413
28 Panel heater ........................................................................................................................................... 414
28.1
Heater versions ............................................................................................................................................ 414
28.2
Mechanical temperature controllers ............................................................................................................. 414
28.3
Electronic temperature and humidity controller ............................................................................................ 415
28.4
Applications for temperature controller ........................................................................................................ 415
29 Service information ............................................................................................................................... 417
29.1
Maintenance ................................................................................................................................................ 417
29.2
Time schedule for maintenance measures .................................................................................................. 417
29.3
Visual inspection .......................................................................................................................................... 418
29.4
Preventive maintenance .............................................................................................................................. 419
29.5
Lubricants to be used .................................................................................................................................. 421
29.6
Overpressure monitors (optional), function test ........................................................................................... 422
29.7
Maintenance of fan(s) for forced ventilation ................................................................................................. 425
29.8
Switchgear extension ................................................................................................................................... 425
110-0134.9 / 14
NXAIR / ≤ 40 kA
Content
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents