Checking And Adjusting The Auger/Impeller Cable - Toro Power Max e26 Operator's Manual

Ha 60v snowthrower
Hide thumbs Also See for Power Max e26:
Table of Contents

Advertisement

Checking and Adjusting the
Auger/Impeller Cable
Service Interval: After the first 2 hours—Inspect the
auger/impeller cable and adjust it if
necessary.
Yearly—Inspect the auger/impeller cable and
adjust or replace it if necessary.
1.
Loosen the jam nut
2.
Engage the auger/impeller lever and hold it in
place
(Figure
31).
Figure 31
3.
Loosen or tighten the turnbuckle to adjust the
spring length to 7 cm (2-3/4 inches) as shown
in
Figure
32.
(Figure
32).
1. Jam nut
2. Turnbuckle
4.
Tighten the jam nut
there is slight tension on the cable.
5.
Turn on the machine and attempt to engage the
auger/impeller drive without moving the lock
switch back; if the auger rotates, loosen the
turnbuckle so that the auger does not engage.
6.
If the auger/impeller cable is properly adjusted
but a problem remains, contact an Authorized
Service Dealer.
g360687
25
Figure 32
3. Spring
4. 7 cm (2-3/4 inches)
(Figure
32), ensuring that
g031000

Advertisement

Table of Contents
loading

This manual is also suitable for:

3992639926t

Table of Contents