Roverpet WB3044DSF Assembly Instructions

30” high 4' x 4' whelping box

Advertisement

Roverpet
20 Kiji Dava Circle Prescott, Arizona 86301
Roverpet #WB3044DSF 30" high 4' x 4' Whelping Box Assembly Instructions
Inventory list for The Roverpet #WB3044DSF Whelping Box:
(7) #130 30" high panels
(1) #44PR4 4" high puppy rail assembly (two leg bars, two cross-bars and four legs
(1) #44DPK Designer Puppy Keeper (6" high)
(12) #250 floor/divider clips (24) #200 panel clips (pre-assembled onto frames by Roverpet)

Assembly Procedure

1.) Unpack contents of shipping carton and compare to parts list above.
2.) Layout the two #130 panels / #D30 door sub-assemblies as show below, with the assembly containing the door
positioned on the right side.
#200 panel clips- pre-attached
to end panels here by Rover
Co.
3.) Connect the ends of the sub-assemblies together with the #200 panel clips that are already attached to the end
panels; reposition panels into a square shape resembling the main photo at the top of this page.
4.) Install #180 straight stabilizers onto the top of in-line connected panels (left photo below) and install #90 corner
stabilizers onto the top of corner connected panels (right photo below).
5.) Lay floor trays side-by-side into the bottom of the Roverpet whelping box with the frame pipes facing up to allow
connection to the side panels.
(1) #D30 30" high door (2) #F24 2'x4' floors
1-800-658-5925
(4) #180 straight stabilizers
rover@roverpet.com
(4) #90 corner stabilizers
Page 1 of 3

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the WB3044DSF and is the answer not in the manual?

Questions and answers

Summary of Contents for Roverpet WB3044DSF

  • Page 1 4.) Install #180 straight stabilizers onto the top of in-line connected panels (left photo below) and install #90 corner stabilizers onto the top of corner connected panels (right photo below). 5.) Lay floor trays side-by-side into the bottom of the Roverpet whelping box with the frame pipes facing up to allow connection to the side panels.
  • Page 2 - Three equally spaced across the mid-span of the floor frames. 7.) Assemble the Roverpet puppy rails by inserting the cross-bars into the through-drilled holes in the main bars and then insert the four legs into the blind holes drilled into the bottom of the main bars; be sure to orientate the main bars so that all four blind holes are facing the same direction.
  • Page 3 12.) Return the end of the fabric back inside the Roverpet whelping box by routing it around the outer frame pipes of the #D30 door and the #130 panel connected to it (left photo at the top of the next page). Run the fabric down the...

Table of Contents