Internal Connections - Follett Horizon Elite HCD1810RHS Installation Instructions Manual

Ride technology, for harmony or 110cm symphony plus applications
Hide thumbs Also See for Horizon Elite HCD1810RHS:
Table of Contents

Advertisement

Connect docking assembly to ice machine.
7.1
Ice transport tube installation
• Slide ice machine into docking assembly
ensuring that drain tube is fully seated on
barbed drain fitting
• Insert ice transport tube all the way into
coupling and tighten nut firmly
7.3
Refrigeration lines
• Evacuate line set.
• Connect self-sealing liquid and suction
line fittings
16
HARMONY and Symphony Plus • RIDE Technology
remote

Internal connections

7.2
Water line
Mount water
solenoid
• Mount water solenoid to inside rear of
docking assembly using one screw
• Insert potable water line into valve
• Insert into push-in connection of water
solenoid
7.4
Power cord
• Remove twist tie
• Carefully pass cord thru opening and plug
into wall outlet
7

Advertisement

Table of Contents
loading

Table of Contents