Type Cp Mounting - York MILLENNIUM YCUL0045SC Installation Operation & Maintenance

Air-cooled condensing units hermetic scroll
Table of Contents

Advertisement

Appendix
Mountings are shipped completely assembled, ready to
install.
1. Locate mountings under equipment at positions shown
on tags or on VM layout drawings, or as indicated on
packing slip or correspondence.
2. Set mountings on subbase, shimming or grouting where
required to provide flat and level surface at the same
elevation for all mountings (1/4" maximum difference in
elevation can be tolerated). Support the full underside
of the base plate - do not straddle gaps or small shims.
3. Unless specified, mountings need not be fastened to
floor in any way. If required, bolt mountings to floor
through slots.
4. Set the machine or base on the mountings. The weight
of the machine will cause the upper housing of
the mount to go down, possibly resting on the lower
housing.
FIG. 23 – TYPE CP MOUNTING
166
APPENDIX 1
INSTALLATION AND ADJUSTING INSTALLATIONS

TYPE CP MOUNTING

5. If clearance "X" is less than 1/4" on any mounting,
with wrench turn up one complete turn on the adjust-
ing bolt of each mounting. Repeat this procedure until
1/4", clearance at "X" is obtained on one or more
mountings.
6. Take additional turns on all mountings having less than
1/4" clearance, until all mountings have at least this
clearance.
7. Level the machine by taking additional turns on all
mounts at the low side. Clearance should not exceed
1/2" - greater clearance indicates that mountings were
not all installed at the same elevation, and shims are
required. This completes adjustment.
LD03837