Installation; Levelling Of Stove; Connections - Jøtul PF 710 Installation, Operation And Maintenance Manual

Table of Contents

Advertisement

Available languages

Available languages

A) Roof outlet protecting against wind
B) Maximum cross-section from 15 x 15 cm or Ø 15 cm,
and maximum height 4-5 m
C) Finishing gasket
D) Inspections
1) Permitted insulating material
1
2
2) Steel pipe
3) Closing pane
fig� 5�5�1
3
fig� 5�5�2
fig� 5�5�3

6 INSTALLATION

The fitter must have the Jøtul certificate, authorising
installation of appliances fired with solid fuel.
6�1 LEVELLING OF STOVE
The stove must be positioned horizontally and vertically
by means of a level gauge. Levelling can be adjusted by
means of adjustable feet (fig. 6.1). Unscrew the feet until
the mounted nuts are reached.
A B = Level gauge
6�2 CONNECTIONS
6�2�1 Electrical connection
It is enough to connect the stove to the electrical grid by
means of a plug.
The electrical connection (socket) must be easily
accessible after installation of the stove and must remain
visible.
If the power cord is damaged, it must be replaced by a
qualified technician in order to avoid risk�
6�2�1�1 Grounding
The installation must strictly be equipped with grounding
and a breaker switch in accordance with binding standards
(fig. 6.2).
The metal chimney flue must have its own connection to
ground�
6�2�2 Connection to an external chronothermostat
It is possible to connect an external chronothermostat,
which extinguishes and ignites the stove depending on
the programmed temperature.
ENGLISH
AB
fig� 6�1
fig� 6�2
9

Advertisement

Table of Contents
loading

Table of Contents