2.7 Debug LEDs
Six on-board Light-Emitting Diodes (LEDs) are provided to allow real-time debugging for
user programs. These LEDs will allow the programmer to monitor program execution
without having to stop the program during debugging; refer to
controlled by Port B's PB0 signal. User LED2 is controlled by PB1. User LED3 is
controlled by PB2. User LED4 is controlled by PB3. User LED5 is controlled by PB4.
User LED6 is controlled by PB5. Setting PB0, PB1, PB2, PB3, PB4 or PB5 to a Logic
One value will turn on the associated LED.
Figure 2-5. Schematic Diagram of the Debug LED Interface
2.8 Debug Support
The 56F826EVM provides an on-board Parallel JTAG Host Target Interface and a JTAG
interface connector for external Target Interface support. Two interface connectors are
provided to support each of these debugging approaches. These two connectors are
designated the JTAG connector and the Host Parallel Interface Connector.
MOTOROLA
Freescale Semiconductor, Inc.
56F826
INVERTING BUFFER
PB0
PB1
PB2
PB3
PB4
PB5
Technical Summary
For More Information On This Product,
Go to: www.freescale.com
Debug Support
2-5. User LED1 is
Figure
+3.3V
RED LED
YELLOW LED
GREEN LED
RED LED
YELLOW LED
GREEN LED
2-7
Need help?
Do you have a question about the DSP56F826EVM and is the answer not in the manual?