3�1 Preliminary warnings
The initial start-up of the heat pump must be carried out
by the Service Centre.
The customer must be present when the appliance is test-
ed and informed of the contents of the manual and proce-
dures. After commissioning, the manual and the warranty
certificate must be handed over to the customer.
Before start-up, all work (electrical and plumbing connec-
tions, filling and venting of air from the plant) must be
completed.
Remove any dirt or debris from the inside of the appliance,
especially chips, wire pieces and screws.
The unit can be supplied with factory-fitted configuration
accessories. For instructions on these accessories, see sec-
tion "Configuration accessories" p. 46.
Make sure that:
• all safety conditions have been met
• the minimum technical clearances have been respected
• the hydraulic connections have been made according to
the instructions in the manual
• the hydraulic plant has been filled and vented
3�2 Powering the appliance
Start the unit:
– set the main switch to ON
The display will light up a few seconds after power-up, check
that the operating status is OFF. Otherwise, press the
ton to put it in Standby.
Refer to the Control Panel Manual for operation.
The first start-up must be carried out with standard set-
tings. Only after the test has been completed, change the
operating set point values.
Power up the unit for at least 12 hours before start-
ing. Make sure the Control Panel is off.
Checks
Perform the following steps after powering up the unit:
– check that the connections made by the installer comply
with the documentation
– check that all hydraulic connections are correctly made
– make sure that the circulation pump is running and that
the water flow rate is sufficient to close the contact of the
differential pressure switch
– check the water flow rate

PUTTING IT INTO SERVICE

• the shut-off valves of the hydraulic circuit are open
• the general power supply cables are of a suitable
• the earthing was performed correctly
• the electrical connections have been established correctly
• all electrical connections are properly secured and all ter-
• the voltage is within a tolerance of 10% of the rated volt-
• the power supply of the three-phase models has a maxi-
• all control wires are connected and all electrical connec-
• the refrigerant connections have been made according to
• the hydraulic circuit interception valves are open
• the mesh filter is clean
– make sure that the differential pressure switch is working
During the initial start-up phase, the technician must meas-
ure the reference values of the plant water with special test
but-
kits.
PUTTING IT INTO SERVICE
cross-section area, capable of supporting the overall draw
of the unit
minals properly tightened
age of the unit
mum unbalance between phases of 3%
tions are firmly in place
the instructions in the manual
Operating the unit without the water filter clean is forbid-
den.
properly
Take the necessary steps to achieve the indicated limits
if the total hardness is greater than 15 °F or some top-up
water reference values are not within the limits indicated.
Water from wells or groundwater that is not from an aq-
ueduct should always be carefully analysed. If necessary,
condition with appropriate treatment systems.
If a softener is installed, in addition to following the man-
ufacturer's instructions, adjust the outlet water hardness
to not less than 5 °F (by performing pH and salinity tests)
and check the outlet chloride concentration after adjust-
ing the resins.