Advertisement

Quick Links

www.ti.com
User's Guide
TMUX741xEVM and TMUX746EVM User's Guide
This document is the EVM user's guide for the TMUX741-746EVM which provides a board for quick DC
parmeter testing for the TMUX741x and TMUX746x families in the QFN and TSSOP package families.
1 1.
Introduction.........................................................................................................................................................................2
2 3. Features of This EVM.........................................................................................................................................................
Setup....................................................................................................................................................4
4 5. TMUX741-746EVM Jumper Connections and Test Points..............................................................................................
5 6.
Schematics..........................................................................................................................................................................6
6 7. Bill of Materials...................................................................................................................................................................
Layouts......................................................................................................................................................................11
Documentation........................................................................................................................................................15
Figure 1-2. TMUX741-746EVM Bottom Side View......................................................................................................................
Figure 5-2. TMUX741-746EVM with DNP/DNI Markings............................................................................................................
Figure 5-3. TMUX741-746EVM Mechanical Hardware and Overlays.........................................................................................
Figure 7-2. 2D Bottom View Layout...........................................................................................................................................
Figure 7-4. 3D Bottom View Of Layout......................................................................................................................................
Trademarks
All trademarks are the property of their respective owners.
SCDU019 - JUNE 2021
Submit Document Feedback

Table of Contents

Warnings.........................................................................................................................3
List of Figures
View............................................................................................................................2
View.........................................................................................................................................11
Layout.............................................................................................................................................13
List of Tables
Copyright © 2021 Texas Instruments Incorporated
ABSTRACT
Markings......................................................................................6
TMUX741xEVM and TMUX746EVM User's Guide
Table of Contents
4
5
9
3
7
8
12
14
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TMUX741 EVM Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments TMUX741 EVM Series

  • Page 1: Table Of Contents

    Figure 7-3. 3D Top View of Layout.............................13 Figure 7-4. 3D Bottom View Of Layout............................List of Tables Trademarks All trademarks are the property of their respective owners. SCDU019 – JUNE 2021 TMUX741xEVM and TMUX746EVM User's Guide Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 2: 1. Introduction

    (RRP) or TSSOP (PW) packages. Figure 1-1 Figure 1-2 show the top and bottom sides of the board respectively. Figure 1-1. TMUX741-746EVM Top Side View TMUX741xEVM and TMUX746EVM User's Guide SCDU019 – JUNE 2021 Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 3: Information About Cautions And Warnings

    EVM in its supplied ESD bad when not in suse. Handle using an antistatic wristband. Operate on an antistatic work surface. For more information on proper handling, see Electrostatic Discharge (ESD). SCDU019 – JUNE 2021 TMUX741xEVM and TMUX746EVM User's Guide Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 4: 3. Features Of This Evm

    8. If VFP/VFN pins are used in the application and are using an external source power this through J3. 9. If the fault flag voltage (VFF) is used in the application, connect and power up this source through J1. TMUX741xEVM and TMUX746EVM User's Guide SCDU019 – JUNE 2021 Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 5: 5. Tmux741-746Evm Jumper Connections And Test Points

    3. Finally, the remaining test points and their location on board. Test Point ID Signal Net Attached to Test Point VFN_V VFP_V TP11 TP10 TP12 TP13 TP14 TP15 TP16 SCDU019 – JUNE 2021 TMUX741xEVM and TMUX746EVM User's Guide Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 6: 6. Schematics

    Figure 5-2 shows the scheamtic with DNP/DNI markings. Figure 5-3 shows mechanical hardware and overlays. Figure 5-1. TMUX741-746EVM Schematic without DNP/DNI Markings TMUX741xEVM and TMUX746EVM User's Guide SCDU019 – JUNE 2021 Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 7: Figure 5-2. Tmux741-746Evm With Dnp/Dni Markings

    6. Schematics Figure 5-2. TMUX741-746EVM with DNP/DNI Markings SCDU019 – JUNE 2021 TMUX741xEVM and TMUX746EVM User's Guide Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 8: Figure 5-3. Tmux741-746Evm Mechanical Hardware And Overlays

    6. Schematics www.ti.com Figure 5-3. TMUX741-746EVM Mechanical Hardware and Overlays TMUX741xEVM and TMUX746EVM User's Guide SCDU019 – JUNE 2021 Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 9: 7. Bill Of Materials

    Shunt 2 pos. 100 SH-J3, SH-J4, Gold plated, Black SH-J5 TP1, TP3, TP6 5005 Keystone Test Point, Red Compact Compact, Red, TH Testpoint SCDU019 – JUNE 2021 TMUX741xEVM and TMUX746EVM User's Guide Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 10 Compact, Blue, Testpoint TP21, TP22, TP23, TP24, TP25, TP26, TP27, TP28, TP29, TP30, TP31, TP32, TP33, TP34, TP35, TP36, TP37, TP38, TP39, TP40 TMUX741xEVM and TMUX746EVM User's Guide SCDU019 – JUNE 2021 Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 11: 8. Pcb Layouts

    Figure 7-4 show the 3D represenation of the layout for both top and bottom respectively. Figure 7-1. 2D Top Side Layout View SCDU019 – JUNE 2021 TMUX741xEVM and TMUX746EVM User's Guide Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 12: Figure 7-2. 2D Bottom View Layout

    8. PCB Layouts www.ti.com Figure 7-2. 2D Bottom View Layout TMUX741xEVM and TMUX746EVM User's Guide SCDU019 – JUNE 2021 Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 13: Figure 7-3. 3D Top View Of Layout

    8. PCB Layouts Figure 7-3. 3D Top View of Layout SCDU019 – JUNE 2021 TMUX741xEVM and TMUX746EVM User's Guide Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 14: Figure 7-4. 3D Bottom View Of Layout

    8. PCB Layouts www.ti.com Figure 7-4. 3D Bottom View Of Layout TMUX741xEVM and TMUX746EVM User's Guide SCDU019 – JUNE 2021 Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 15: Related Documentation

    TMUX7462F ±60-V Fault-Protected, Latch-Up Immune, 4-Channel Protector, Adjustable Fault Threshold, 1.8-V Logic • Texas Instruments, TMUX741xF ±60 V Fault-Protected, 1:1 (SPST), 4-Channel Switches with 1.8-V Logic data sheet SCDU019 – JUNE 2021 TMUX741xEVM and TMUX746EVM User's Guide Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 16 STANDARD TERMS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, and/or documentation which may be provided together or separately (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms set forth herein.
  • Page 17 www.ti.com Regulatory Notices: 3.1 United States 3.1.1 Notice applicable to EVMs not FCC-Approved: FCC NOTICE: This kit is designed to allow product developers to evaluate electronic components, circuitry, or software associated with the kit to determine whether to incorporate such items in a finished product and software developers to write software applications for use with the end product.
  • Page 18 www.ti.com Concernant les EVMs avec antennes détachables Conformément à la réglementation d'Industrie Canada, le présent émetteur radio peut fonctionner avec une antenne d'un type et d'un gain maximal (ou inférieur) approuvé pour l'émetteur par Industrie Canada. Dans le but de réduire les risques de brouillage radioélectrique à...
  • Page 19 www.ti.com EVM Use Restrictions and Warnings: 4.1 EVMS ARE NOT FOR USE IN FUNCTIONAL SAFETY AND/OR SAFETY CRITICAL EVALUATIONS, INCLUDING BUT NOT LIMITED TO EVALUATIONS OF LIFE SUPPORT APPLICATIONS. 4.2 User must read and apply the user guide and other available documentation provided by TI regarding the EVM prior to handling or using the EVM, including without limitation any warning or restriction notices.
  • Page 20 Notwithstanding the foregoing, any judgment may be enforced in any United States or foreign court, and TI may seek injunctive relief in any United States or foreign court. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2019, Texas Instruments Incorporated...
  • Page 21 TI products. TI’s provision of these resources does not expand or otherwise alter TI’s applicable warranties or warranty disclaimers for TI products.IMPORTANT NOTICE Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2021, Texas Instruments Incorporated...

This manual is also suitable for:

Tmux746evmTmux741-746evmTmux741xevm

Table of Contents