11. Installation Instruction

11.1 Select the Best Location

11.1.1
Indoor Unit
Do not install the unit in excessive oil fume area
such as kitchen, workshop and etc.
There should not be any heat source or steam
near the unit.
There should not be any obstacles blocking the air
circulation.
A place where air circulation in the room is good.
A place where drainage can be easily done.
A place where noise prevention is taken into
consideration.
Do not install the unit near the door way.
Ensure the spaces indicated by arrows from the
wall, ceiling, fence or other obstacles.
Mount with the lowest moving parts at least 8ft
(2.4 m) above floor or grade level.
11.1.2
Outdoor Unit
If an awning is built over the unit to prevent direct
sunlight or rain, be careful that heat radiation from
the condenser is not obstructed.
There should not be any animal or plant which
could be affected by hot air discharged.
Keep the spaces indicated by arrows from wall,
ceiling, fence or other obstacles.
Do not place any obstacles which may cause a
short circuit of the discharged air.
If piping length is over the [piping length for
additional gas], additional refrigerant should be
added as shown in the table.
Recommended installation height for outdoor unit
should be above the seasonal snow level.
Be careful not to locate outdoor unit directly under
a roof line where falling snow or ice can cause
damage or dripping water can increase ice
accumulation and defrost cycles.
Piping size
Capacity
Model
(Btu/h)
Gas
Liquid
1/2"
1/4"
XE15SKUA
15000
(12.7 mm)
(6.35 mm)
Example: For XE15SKUA
If the unit is installed at 32.8 ft (10 m) distance, the
quantity of additional refrigerant should be 2.46 oz
(62.5 g) .... (32.8 - 24.6) ft x 0.3 oz/ft = 2.46 oz.
((10-7.5) m x 25 g/m = 62.5 g)
Min.
Max.
Std.
Max.
Additional
Piping
Piping
Length
Elevation
Refrigerant
Length
Length
24.6 ft
49.2 ft
9.8 ft
65.6 ft
0.3 oz/ft
(7.5 m)
(15 m)
(3 m)
(20 m)
(25 g/m)
11.1.3
/
1
31
"
32
(50 mm)
or more
Insulation of piping connections
• Carry out insulation after
checking for gas leaks and
secure with vinyl tape.
Attaching the remote control holder
to the wall
Remote control holder fixing screws
Remote
control
3
It is advisable to avoid more
than 2 blockage directions.
For better ventilation &
multiple-outdoor installation,
please consult authorized
dealer/specialist.
• This illustration is for
explanation purposes only.
The indoor unit will actually face
a different way.
Piping
Length for
add. gas
24.6 ft
(7.5 m)
21
Indoor/Outdoor Unit Installation
Diagram
Piping direction
(Front side)
Right
Rear
Right
Left
Left
bottom
Rear Left bottom
(Left and right are identical)
Floor / Grade level
Vinyl tape
6
Remote control holder
5
Do not bend up
drain hose
Installation parts you
should purchase ( )
Installation plate 1
Bushing-Sleeve ( )
Sleeve ( )
Putty ( )
(Gum Type Sealer)
Bend the pipe as
closely on the wall
as possible, but be
careful that it doesn't
break.
Vinyl tape (wide) ( )
• Apply after carrying
out a drainage test.
• To carry out the
drainage test,
remove the air filters
and pour water into
the heat exchanger.
Saddle ( )
Connection cable ( )
Liquid side piping ( )
Gas side piping ( )
Additional drain
hose ( )

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cu-xe15skua

Table of Contents