SE-1200 Series Electrocardiograph Service Manual
Inspection and Troubleshooting
Figure 5-12 UART Screen
5.3 Module Tests
When a module is suspected of malfunction, the verification methods are described in this
chapter.
5.3.1 Main Board Test
To verify the main board,
1) Open the main unit following the procedures described in Chapter 6, "Electrocardiograph
Disassembly".
2) Switch on the device.
3) Measure the voltage to earth of the test points listed below by using a multimeter.
- 39 -