Installation And Commissioning; General Installation; Room Requirements - Zanussi LIBERO IWOKEC-1P/1ZT Service Manual

Wok induction
Table of Contents

Advertisement

LIBERO LINE WOK INDUCTION
2

INSTALLATION AND COMMISSIONING

2.1

GENERAL INSTALLATION

All the non-standard or out-of-standard situations should be reported on the commissioning form and duly
documented for future reference. The documentation available on the web sites (PRIDE-SERVICE PORTAL-
AGELUX etc..) In case of any doubt, refer to your local country customer care.
UNPACKING AND POSITIONING THE EQUIPMENT
WARNING / CAUTION !
Before any operation on the machine read Chapter
MATION/PRECAUTIONS. We recommend for any phase involving the removal of
the packaging to use cut-resistant gloves

ROOM REQUIREMENTS

To guarantee continuous operation, the room temperature range must be between 5°C and 40°C.
Outdoor functioning is strictly allowed only if the machine can be protected against any conditions being out of
the above temperature range and against any atmospheric agents.
On a hot cupboard base take precaution to install a baffle for preventing hot air to reach the oven fresh air
intake; this could create malfunctioning.
High room humidity may cause water to condensate on electric components hence causing short circuit.
SAFETY INFOR-
18

Advertisement

Table of Contents
loading

This manual is also suitable for:

406600893

Table of Contents