Pacific Zuma Assembly And Maintenance Manual page 25

Strength-training fitness equipment
Table of Contents

Advertisement

Zuma Assembly and Maintenance Guide
I.
Again, repeat for the Main Upright. Slide a small
Foam Roller completely on one end of a Roller Pad
Rod, then secure it in place by pounding one
mushroom cap in the end using the rubber mallet.
J. Insert the Roller Pad Rod through the hole in the
Main Upright above the previously installed Seat
Pad.
K. Slide a small Foam Roller on the other end of the
Roller Pad Rod, then secure it in place by pounding
one mushroom cap in the end using the rubber
mallet.
L. Attach the other Seat Pad to the Main Upright using
two 3¾-inch bolts
two washers
Wrench tighten. You may want to make sure that
the seam on the pad faces down.
Step 12. Install Seat and Rollers, Continued
Seat Pad
2 - 3¾" bolts
L
2 - washers
1
2
Large Foam Roller
Roller Pad Rod
3
4
5
Mushroom Cap
6
page 25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents

Save PDF