Pacific Zuma Assembly And Maintenance Manual page 19

Strength-training fitness equipment
Table of Contents

Advertisement

Zuma Assembly and Maintenance Guide
K. Wrap the Main Cable up and over the pulley
installed in step I and feed it up through the back
window in the Top Beam.
L. Attach one 3½-inch pulley over the Cable and in
the back window of the Top Beam using
one 2¾-inch bolt
two ½-inch step spacers
one locknut
Make sure the Cable is underneath the pulley.
Wrench tighten.
M. Wrap the Cable over the pulley and feed it through
the front window of the Top Beam.
N. Attach one 4½-inch pulley under the Cable and in
the front window of the Top Beam using
one 2¾-inch bolt
two ½-inch step spacers
one locknut
Wrench tighten.
Step 8. Install Main Cable, Continued
Press Arm
1
2
Top Beam
3
4
5
1 - 3½" pulley
L
1 - 2¾" bolt
2 - ½" step spacers
1 - locknut
1 - 4½" pulley
N
1 - 2¾" bolt
2 - ½" step spacers
1 - locknut
6
page 19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents