Pacific Zuma Assembly And Maintenance Manual page 18

Strength-training fitness equipment
Table of Contents

Advertisement

Zuma Assembly and Maintenance Guide
E. Feed Main Cable 40509-102 through the two
vertical bars in the Press Arm and allow it to hang.
F.
Attach one 3½-inch pulley in the Press Arm over
the Cable using
one 7½-inch bolt
two washers
two barrel spacers
one locknut
Finger tighten.
G. Attach one 3½-inch pulley in the top window of the
Main Upright using
one 2¾-inch bolt
two ½-inch step spacers
one locknut
Finger tighten.
H. Feed the Cable over the top of the pulley installed
in step F, then feed it under the pulley installed in
step G and back over the top. Pull the Cable back
through the two vertical bars in the Press Arm.
I.
Attach one 3½-inch pulley in the Press Arm, over
the pulley installed in step F and with the Cable
passing underneath, using
one 7½-inch bolt
two washers
two barrel spacers
one locknut
Ensure the Cable is below the pulley. Finger
tighten.
J. Wrench tighten all bolts from steps F, G, and I
(bolts for the three pulleys you just installed).
Step 8. Install Main Cable, Continued
Press Arm
Main Upright
1
2
1 - 3½" pulley
F
1 - 7½" bolt
2 - washers
2 - barrel spacers
1 - locknut
1 - 3½" pulley
I
1 - 7½" bolt
2 - washers
2 - barrel spacers
1 - locknut
3
4
5
1 - 3½" pulley
G
1 - 2¾" bolt
2 - ½" step spacers
1 - locknut
6
page 18

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents