Conversion Procedure - Fujitsu PRIMERGY PG-R1CK7 User Manual

C200(pgc2cl1qa/pgc2cp1qa) rack conversion kit
Table of Contents

Advertisement

Conversion procedure

The following is the procedure to convert the server from a deskside model to a rackmount
model.
When installing or removing hardware options from the server,
turn off the server, all peripheral devices, the server monitor
module, and any other the connected devices. Also unplug all
power cords. Failure to do so can lead to electric shock.
Contact your maintenance engineer to perform the conver-
sion.
For safety reasons, make sure the server is located on a sta-
ble and level surface when perform the conversion work as
the combined weight can be in excess of 30kg.
Also, work in an open space as the rackmount must be laid
horizontally to perform the conversion.
Make sure that the system is operating properly before per-
forming the conversion.
Devices inside the server remain hot after shutdown. Wait for
approximately 10 minutes after shutdown before installing or
removing hardware options from the server.
Static electricity can damage the internal hardware compo-
nents. Wear a wrist grounding strap when working inside the
server.
Do not touch any panel circuitry. Hold the metallic areas or
the green areas of the circuit boards.
E
5

Advertisement

Chapters

Table of Contents
loading

Table of Contents