Pre-Installation - New Yorker AP-U AP-110U-N Installation, Operating And Service Instructions

Table of Contents

Advertisement

2

Pre-Installation

A. INSPECT SHIPMENT carefully for any signs of
damage.
1. All equipment is carefully manufactured,
inspected and packed. Our responsibility
ceases upon delivery of crated boiler to the
carrier in good condition.
2. Any claims for damage or shortage in
shipment must be filed immediately against the
carrier by the consignee. No claims for
variances from, or shortage in orders, will be
allowed by the manufacturer unless presented
within sixty (60) days after receipt of goods.
B. LOCATE BOILER near final position before
removing crate. See Figure 1-1. Using hand
truck or pipe rollers under skid, move boiler into
position along side installation site.
!
CAUTION
DO NOT drop boiler. DO NOT bump boiler
jacket against floor.
1. LOCATE so that vent pipe connection to
chimney will be short and direct.
2. BOILER IS NOT SUITABLE FOR
INSTALLATION ON COMBUSTIBLE FLOOR
without factory supplied floor shield (available
option at extra cost), see Page 9 for additional
details. A Combustible Floor Shield can also
A
B
Chimney
Above
Front
Connector
18
48
NOTE 1: Listed clearances comply with American National
Standard NFPA 31, Standard for the Installation of Oil
Burning Equipment.
110839-01 -8/20
Figure 2-1: Minimum Clearances to Combustible Materials
C
D
E
Rear
Sides
18
18
18
Installation & Service Manual
AP-U
be constructed in accordance with NFPA 31.
DO NOT install boiler on carpeting.
3. FOR BASEMENT INSTALLATION, provide a
solid elevated base, such as concrete, if floor
is not level, or if water may be encountered on
floor around boiler.
!
WARNING
DO NOT support boiler by placing blocks at the
four (4) corners of the boiler.
Boiler base must be evenly supported under
entire base.
Concrete over wood joists is considered
combustible flooring. DO NOT operate on
masonry floors, which may contain moisture.
4. PROVIDE SERVICE CLEARANCE of at least
48" clearance from front jacket panel for
servicing burner and removal of front tankless
heater.
5. For minimum clearances to combustible
materials. See Figure 2-1.
NOTICE: Clearance to venting is for single wall
vent pipe. If Type L vent is used, clearance may
be reduced to the minimum required by the vent
pipe manufacturer.
NOTE 2: AP-U™ Series boilers can be installed in rooms
with clearances from combustible material as listed above.
Listed clearances cannot be reduced for alcove or closet
installations.
NOTE 3: For reduced clearances to combustible material,
protection must be provided as described in the ANSI/NFPA
31 standard.
7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ap-u ap-110u-tAp-u ap-154u-nAp-u ap-154u-t

Table of Contents