Table Of Contents; Pre-Installation - New Yorker Classic CGS-A Series Installation, Operating And Service Instructions

Gas boiler
Table of Contents

Advertisement

Table of Contents

I. Pre-Installation . .............................. 3
II. Unpack Boiler ................................ 5
III. Steam Piping and Trim ................... 5
IV. Gas Piping . ..................................... 8
V. Venting ......................................... 10
I. Pre-Installation
W
A
C
r a
f e
l u
y l
e r
a
d
a
l l
n i
n i
s
a t
l l
n i
g
b
i o
e l
. r
F
i a
n i
t s
u r
t c
o i
n
s
n i
p
o r
p
p
e
s r
o
n
l a
n i
u j
y r
o
r
d
A
. Inspect shipment carefully for any signs of damage.
All equipment is carefully manufactured, inspected
and packed. Our responsibility ceases upon delivery
of boiler to carrier in good condition. Any claim
for damage or shortage in shipment must be filed
immediately against carrier by consignee. No claims
for variances or shortages will be allowed by Boiler
Manufacturer, unless presented within sixty (60) days
after receipt of equipment.
B.
Installation must conform to the requirements of the
authority having jurisdiction. In the absence of such
requirements, installation must conform to National
Fuel Gas Code, NFPA 54/ANSI Z223.1 Where required
by the authority having jurisdiction, the installation
must conform to the Standard for Controls and Safety
Devices for Automatically Fired Boilers, ANSI/ASME
CSD-1.
C.
Boiler is design certified for installation on
noncombustible flooring only. For installation on
combustible flooring only when installed on special
base listed in Table 2. The boiler must not be installed
on carpeting.
D.
Provide clearance between boiler jacket and
combustible material in accordance with local fire
ordinance. Refer to Figure 2 for minimum clearance
from combustible material for alcove installation.
R
N
N I
G
t s
u r
t c
o i
n
s
b
e
o f
e r
u l
e r
o t
f
l o
o l
w
a
l l
r e
o
d r
r e
c
a
n
c
a
u
s
e
e
t a
. h
VI. Electrical . ...................................... 13
VII. System Start-up ............................ 18
VIII. Service ......................................... 23
IX. Repair Parts .................................. 28
Warranty ........................ Back Cover
Table 2: Special Base for Installation on
Combustible Flooring
B
o
l i
r e
M
o
d
l e
S
3
0
4
0
5
0
6
0
7
0
8
0
Figure 2: Minimum Clearances to Combustible
Construction for Alcove Installation
p
e
i c
l a
B
a
s
e
P
a
t r
N
u
m
b
6
1
8
1
2
0
3
6
6
1
8
1
2
0
4
6
6
1
8
1
2
0
5
6
6
1
8
1
2
0
6
6
6
1
8
1
2
0
7
6
6
1
8
1
2
0
8
6
r e
3

Advertisement

Table of Contents
loading

Table of Contents