A. INSPECT SHIPMENT carefully for any signs of
damage.
1. All equipment is carefully manufactured,
inspected and packed. Our responsibility
ceases upon delivery of crated boiler to the
carrier in good condition.
2. Any claims for damage or shortage in shipment
must be filed immediately against the carrier
by the consignee. No claims for variances
from, or shortage in orders, will be allowed by
the manufacturer unless presented within sixty
(60) days after receipt of goods.
B. LOCATE BOILER in front of final position before
removing crate. See Figure 1-1.
1. LOCATE so that vent pipe connection to
chimney will be short and direct.
2. BOILER IS SUITABLE FOR INSTALLATION
ON COMBUSTIBLE FLOOR. Boiler cannot be
installed on carpeting.
Figure 2-1: Minimum Installation Clearances To Combustible Materials (Inches)
NOTES:
1. Listed clearances comply with American
National Standard ANSI/NFPA 31, Installation
of Oil Burning Equipment.
2. CL Series boilers can be installed in rooms
with clearances from combustible material
as listed above. Listed clearances cannot be
reduced for alcove or closet installations.
110772-01 - 5/20
CL
Installation & Service Manual
3. FOR BASEMENT INSTALLATION, provide a
solid elevated base, such as concrete, if floor
is not level, or if water may be encountered on
floor around boiler.
4. PROVIDE SERVICE CLEARANCE of at least
24" clearance from front jacket panel for
servicing. If boiler is equipped with a rear
tankless heater, provide at least 24" service
clearance on the right side of the boiler.
Boiler flueways may be cleaned from the top.
Provide at least 24" clearance from the top of
the boiler for cleaning flueways.
5. For minimum clearances to combustible
materials. See Figure 2-1.
C. PROVIDE COMBUSTION AND VENTILATION
AIR. Local and National Codes may apply and
should be referenced.
3. For reduced clearances to combustible
material, protection must be provided as
described in the above ANSI/NFPA 31
standard.