I. Pre-Installation
W
A
C
r a
f e
l u
y l
e r
a
d
a
l l
n i
n i
s
a t
l l
n i
g
b
i o
e l
. r
F
i a
n i
t s
u r
t c
o i
n
s
n i
p
o r
p
p
e
s r
o
n
l a
n i
u j
y r
o
r
d
A
. Inspect shipment carefully for any signs of damage. All
equipment is carefully manufactured, inspected and
packed. Our responsibility ceases upon delivery of
boiler to carrier in good condition. Any claim for damage
or shortage in shipment must be filed immediately
against carrier by consignee. No claims for variances or
shortages will be allowed by Boiler Manufacturer,
unless presented within sixty (60) days after receipt of
equipment.
B.
Installation must conform to the requirements of the
authority having jurisdiction. In the absence of such
requirements, installation must conform to National
Fuel Gas Code, NFPA 54/ANSI Z223.1 Where required
by the authority having jurisdiction, the installation
must conform to the Standard for Controls and Safety
Devices for Automatically Fired Boilers, ANSI/ASME
CSD-1.
C.
Appliance is design certified for installation on
combustible flooring. The boiler must not be installed
on carpeting.
D.
Provide clearance between boiler jacket and
combustible material in accordance with local fire
ordinance. Refer to Figure 2 for minimum clearance from
combustible material for closet installation. For alcove
or unconfined space installations height clearance
maybe reduced to 27". Subject to boiler and system
piping, left side clearance may be reduced to 1" if right
side clearance is increased to 9".
E.
Provide practical service clearances. A minimum of 24"
from the left side and front jacket panels is
recommended for servicing but may be reduced to
minimums shown in Figure 2. Subject to boiler and
system piping, left side clearance may be reduced to 1"
if right side clearance is increased to 9".
R
N
N I
G
t s
u r
t c
o i
n
s
b
e
o f
e r
u l
e r
o t
f
l o
o l
w
a
l l
r e
o
d r
r e
c
a
n
c
a
u
s
e
e
t a
. h
VI.
Electrical ............................................... 11
VII.
System Start-up .................................... 15
EI Trouble Shooting Guide ................... 20
VIII.
Service .................................................. 22
IX.
Repair Parts .......................................... 24
F.
Install on level floor. For basement installation provide
concrete base if floor is not level or if water may be
encountered on floor around boiler.
G.
Protect gas ignition system components from water
(dripping, spraying, rain, etc.) during boiler operation
and service (circulator replacement, condensate trap,
control replacement, etc.).
H.
Provide combustion and ventilation air in accordance
with applicable provisions of local building codes, or
National Fuel Gas Code, NFPA 54/ANSI Z223.1,
Section 5.3, Air for Combustion and Ventilation.
Figure 2: Minimum Clearances to Combustible
Construction for Closet Installation