SECTION II: PRE-INSTALLATION
A. INSPECT SHIPMENT carefully for any signs of
damage.
1. All equipment is carefully manufactured, inspected
and packed. Our responsibility ceases upon delivery
of crated boiler to the carrier in good condition.
2. Any claims for damage or shortage in shipment
must be filed immediately against the carrier by the
consignee. No claims for variances from, or shortage
in orders, will be allowed by the manufacturer
unless presented within sixty (60) days after receipt
of goods.
B. LOCATE BOILER in front of final position before
removing crate. See Figure 1.
1. LOCATE so that vent pipe connection to chimney
will be short and direct.
2. BOILER IS SUITABLE FOR INSTALLATION
ON COMBUSTIBLE FLOOR. Boiler cannot be
installed on carpeting.
3. FOR BASEMENT INSTALLATION, provide
a solid elevated base, such as concrete, if floor is
not level, or if water may be encountered on floor
around boiler.
4. PROVIDE RECOMMENDED SERVICE
CLEARANCE, if applicable, as follows:
a. Clearance from Jacket Front Panel -
24" for servicing burner
18"
6"
Figure 2A: Chimney Vent - Minimum Installation Clearances To Combustible Materials (Inches)
NOTES:
1. Listed clearances comply with American National Standard ANSI/NFPA 31, Standard for the Installation of Oil Burning Equipment.
2. CI-HGS-B boilers can be installed in rooms with clearances from combustible material as listed above. Listed clearances cannot be reduced for
alcove or closet installations.
3. For reduced clearances to combustible material, protection must be provided as described in the above ANSI/NFPA 31 standard.
18"
6"
24" for flueway cleaning (CI-HGS-74B thru
CI-HGS-129B)
30" for flueway cleaning (CI-HGS-167B)
b. Clearance from Jacket Left Side Panel -
19" for burner swing door, if opened fully
with burner mounted, otherwise 1" with
burner removed
12" access clearance to service rear of
3" minimum if right side clearance is 12" or
larger to access and service rear of boiler.
c. Clearance from Jacket Right Side Panel -
3" minimum if left side clearance is 12" or
larger to access and service rear of boiler.
d. Clearance from Jacket Rear Panel -
12" minimum for rear smokebox cleaning
(Note: This dimension will also be
controlled by horizontal to vertical to
horizontal smokepipe arrangement -
Chimney Vent (see Figures 2A and 13).
24" for rear smoke box cleaning and
disconnecting vent pipe from boiler adaptor
for servicing (if required) - Direct Vent (see
Figures 2B and 25).
5. For minimum clearances to combustible materials.
See Figures 2A and 2B.
18"
6"
24"
boiler if right side clearance is less
than 12"
18"
18"
18"