Inspection - Bosch Rexroth HD 2/H Assembly Instructions Manual

Lift-rotate unit
Table of Contents

Advertisement

Maintenance and repair
45/56

10.2 Inspection

Lift rotate unit
Regularly check the pneumatic connections for leaks.
The pressure point of the fi ngers in the hub latches (only sizes 1 and 2).
Check the spring action of all pressure points regularly, every 2000 hours or every
500000 cycles (whichever is reached fi rst). The spring action of the pressure points
must be felt across the entire movement of the fi nger.
358 732-20
Fig. 26:
Check the spring action of the pressure point
Worn pressure points must be replaced (see chapter 10.4 "Replacement of worn
parts" on page 47),
3 842 358 796/2015-01, MIT: HD 2/H, Bosch Rexroth AG

Advertisement

Table of Contents
loading

This manual is also suitable for:

3 842 998 7603 842 998 7613 842 998 762

Table of Contents