Husqvarna PG 690 Operator's Manual page 31

Hide thumbs Also See for PG 690:
Table of Contents

Advertisement

Available languages

Available languages

position is also used when you set the product in
transport position.
Position 2: Standard pressure on the grinding head.
Position 3: Minimum pressure on the grinding head.
This position is also used when you tilt the product to
servicing position.
To assemble and disassemble the weights
The product has 1 weight on each side of the product.
Do the procedure that follows on each weight.
1163 - 004 - 01.10.2020
1. Install the weight holder and tighten the 4 screws.
2. Install the 2 weight brackets. Make sure that the
weight brackets are installed correctly as shown in
the illustration.
3. Put the weight on the cylinder (A) on the weight
holder.
A
B
31

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pg 690 rcPg 830Pg 830 rcPg 400Pg 680 rcPg 680

Table of Contents