Installation - Alpha ESS eSTORE-BAT-10.3 Manual

Battery module
Table of Contents

Advertisement

Your Smart Energy

Installation

the floor or platform.
Installation
Step 1: open the battery package.
Note: The box must be placed in the direction of the label and only remove the
packaging in upwards direction. Removing the packaging in other directions is wrong.
Step 2: Fixed the bracket on the battery with M5*10 screws.
______________________________________________________________________
Alpha ESS Co., Ltd.
Page 13 of 31

Advertisement

Table of Contents
loading

Table of Contents